Europe · Paris overlap

Production-grade workflow automation for Paris.

Lean workflow automation that runs in production, not a pitch deck. Built remotely for Paris teams by Syncraft Studio, with the boring reliability of real infrastructure.

01 / 03

Hours spent copy-pasting between tools

Watch a working day for an hour: how much of it is moving the same data between two tabs? That's the workflow waiting to be automated, and the one with the cleanest payback.

02 / 03

Approvals stuck in someone's inbox

An approval stuck in a Slack DM is invisible to the rest of the system. Handoffs need a queue, a timeout, and an audit trail, not someone remembering to check.

03 / 03

One person becoming the system

When one person becomes the system, the system has a single point of failure. They go on holiday, the work stops; they leave, the work stops permanently.

Approach

How we build workflow automation

We start with one measurable workflow, instrument it, and ship it inside four weeks. For Paris engagements that means n8n on your own infrastructure wired to Linear with a typed adapter, retries, and an audit log you can read. The win is approvals, hand-offs, and reporting that runs without anyone touching it, measured against process cycle time from day one. Code lives in your repository, deployed to your infrastructure, with no platform lock-in. You can take it in-house at any point. Most Paris teams keep us on a small monthly retainer for monitoring and iteration; some take ownership outright after the first build.

Real case study
Sheelaa.com

Inbound WhatsApp lead engine, auto-qualify, route, and follow up.

Quick answers

What teams in Paris ask first.

How much does workflow automation cost in France?Open

A single shipped workflow on a Spark engagement runs €5-25k depending on complexity. Multi-workflow builds for Paris teams typically land in the €40-120k range. Pricing is quoted to outcome, not hours, and visible before we start. France clients are billed in EUR or GBP; SEPA and SWIFT both work.

How long does workflow automation take to ship?Open

A single workflow automation workflow goes from kickoff to production in roughly four weeks: one week instrumenting and designing, two weeks building, one week hardening. Multi-step processes spanning several systems usually take 6-10 weeks. We always ship the first measurable slice inside one month.

Do you handle GDPR for France clients?Open

Yes. Engagements run in EU regions where data residency requires it, and DPA + SCC clauses are standard in every contract. Data flows, retention, and processor relationships are documented up-front. Our remote-India delivery model is structured to comply with GDPR for France clients, we have done it before.

One workflow, four weeks, measurable lift.

Send a short note about the process you want to automate and the metric you want to move. We reply within one working day with a fit assessment, rough scope, and price range.

Reply within one working day · No-pressure scoping